---
title: "Augmenta Case Study: Miller Electric Company, 2024"
description: Explore our case study and learn how Miller Electric Company piloted Augmenta's ACP Electrical Design Module to retroactively automate the process of designing electrical raceway systems on historical projects. They reduced their modeling time by 40%!
image: https://info.augmenta.ai/hubfs/adam.jpg
---

[![augmenta-Logo-white-on-clear_1200x247](https://info.augmenta.ai/hs-fs/hubfs/Logos/augmenta-Logo-white-on-clear_1200x247.png?width=1200&height=247&name=augmenta-Logo-white-on-clear_1200x247.png)](https://www.augmenta.ai/)

- Platform
  
  [![](https://info.augmenta.ai/hs-fs/hubfs/Rectangle%201003.png?width=75&height=75&name=Rectangle%201003.png) Electrical Learn more](https://www.augmenta.ai/electrical)
  
  ![62a8b06220bc7009d0590724_Rectangle 1003-3](https://info.augmenta.ai/hs-fs/hubfs/62a8b06220bc7009d0590724_Rectangle%201003-3.png?width=75&height=75&name=62a8b06220bc7009d0590724_Rectangle%201003-3.png)
  
  Structural
  
  
  
  Coming soon
  
  
  
  
  
  
  
  ![62a8b06220bc7000e0590726_Rectangle 1003-1](https://info.augmenta.ai/hs-fs/hubfs/62a8b06220bc7000e0590726_Rectangle%201003-1.png?width=75&height=75&name=62a8b06220bc7000e0590726_Rectangle%201003-1.png)
  
  Plumbing
  
  
  
  Coming soon
  
  
  
  
  
  
  
  ![62a8b06220bc70239b590723_Rectangle 1003-4](https://info.augmenta.ai/hs-fs/hubfs/62a8b06220bc70239b590723_Rectangle%201003-4.png?width=75&height=75&name=62a8b06220bc70239b590723_Rectangle%201003-4.png)
  
  Automated Prefab
  
  
  
  Coming soon
  
  
  
  
  
  
  
  ![62a8b06220bc70de0c590728_Rectangle 1003-2](https://info.augmenta.ai/hs-fs/hubfs/62a8b06220bc70de0c590728_Rectangle%201003-2.png?width=75&height=75&name=62a8b06220bc70de0c590728_Rectangle%201003-2.png)
  
  Mechanical
  
  
  
  Coming soon
- [Careers](https://www.augmenta.ai/careers)
- [About us](https://www.augmenta.ai/about)
- [Contact us](https://www.augmenta.ai/contact)

#### Case Study

# **How Miller Electric Reduced their Modeling Time by 40%**

Explore our case study and learn how Miller Electric Company piloted Augmenta Construction Platform's automated Electrical Design Module to retroactively automate the process of designing electrical raceway systems on historical projects.

![MILLER_LOGO_2019_FLAT_SOLO_REV_WHITE](https://info.augmenta.ai/hs-fs/hubfs/MILLER_LOGO_2019_FLAT_SOLO_REV_WHITE.png?width=200&height=96&name=MILLER_LOGO_2019_FLAT_SOLO_REV_WHITE.png)

 

# The Challenge

Miller Electric Company is an American electrical engineering firm established in 1928 with an annual revenue of around $600M, 19 office locations, and more than a thousand employees. Miller Electric Company faces typical but urgent industry challenges associated with designing electrical raceway systems for large-scale commercial buildings: 

- A process that is highly complex and time consuming
- A shortage of experienced design talent
- Tight schedules and cost constraints

They are eager to find ways to make their design teams more efficient, using new processes and technologies.

 

 

![graham-ruttan-b3LF7JHQmms-unsplash](https://info.augmenta.ai/hs-fs/hubfs/graham-ruttan-b3LF7JHQmms-unsplash.jpg?width=1000&height=391&name=graham-ruttan-b3LF7JHQmms-unsplash.jpg "graham-ruttan-b3LF7JHQmms-unsplash")

Hospital setting with emergency room signage. Photo credit: Graham Ruttan from Unsplash.

# The Solution

Miller Electric Company undertook a pilot project led by Adam S. Davis, Sr. Manager, Fabrication & Modularization, to partner with Augmenta. Using Augmenta’s automated Electrical Design Module, they completely automated the process of designing electrical raceway systems. Running Augmenta’s software on historical projects, Miller Electric Company compared the solutions generated and the time to create those designs with the output of their traditional design processes. They retroactively automated the design of electrical conduit for two medical facilities.

# The Result

Augmenta enabled Miller Electric Company to significantly increase the capacity of their VDC team. They realized around 40% time-savings in electrical modeling time across their Augmenta pilot projects - the equivalent of adding 2-3 BIM team member’s time, without adding more overhead costs. Furthermore, they predict that with time-savings and the Augmenta platform’s capability to estimate material and labor costs, their VDC team will be able to provide detailed estimates both during bidding and when responding to change requests. Ultimately, Augmenta will enable Miller Electric Company’s VDC team to maintain a competitive edge in the evolving construction sector.

 

 

 

**“Augmenta provides a solution for aggressive project schedules, scaling teams and minimizing rework in the preconstruction phase of projects.”**

 

"Our Pilot Program with Augmenta provided tangible outcomes that we can make business decisions around.   Their support and engagement during the process was excellent with skilled team members who understand electrical construction.  Our preparedness with a highly developed PreConstruction Process and Detailed tracking internally, aided in the "Apples to Apples" takeaways.  A differentiator to the Augmenta product, is that the solutions are utilizing a level of model development that can be sent directly to fabrication."

 

- Adam S. Davis, Sr. Manager of Fabrication & Modularization, Miller Electric Company

![adam](https://info.augmenta.ai/hs-fs/hubfs/adam.jpg?width=600&height=400&name=adam.jpg)

 

 

 

# Augmenta's Core benefits

 

 

### ![design fast](https://info.augmenta.ai/hubfs/design%20fast.svg)

### Faster Design

The VDC team created coordinated designs in hours instead of weeks

### ![coordinated](https://info.augmenta.ai/hubfs/coordinated.svg)

### Fully Coordinated

Designs were fully coordinated and clash-free against all building systems

### ![better design](https://info.augmenta.ai/hubfs/better%20design.svg)

### Better Design

The VDC Team produces higher quality designs far faster

 

 

Augmenta Construction Platform - Electrical module: Generate and compare fully routed and coordinated designs.

 

 

 

![plot to solution loop](https://info.augmenta.ai/hs-fs/hubfs/plot%20to%20solution%20loop.gif?width=1000&height=519&name=plot%20to%20solution%20loop.gif "plot to solution loop")

         

 

 

### The future of building design

Learn how your organization can use and benefit from the Augmenta Construction Platform

[Join the Augmenta Pilot Program](https://www.augmenta.ai/electrical#contact-form)

![augmenta-Logo-white-on-clear_1200x247](https://info.augmenta.ai/hs-fs/hubfs/Logos/augmenta-Logo-white-on-clear_1200x247.png?width=1200&height=247&name=augmenta-Logo-white-on-clear_1200x247.png)

- [![](https://info.augmenta.ai/hs-fs/hubfs/LinkedIn_icon%201.png?width=90&height=90&name=LinkedIn_icon%201.png)](https://www.linkedin.com/company/augmenta-ai/)

- [Platform](https://www.augmenta.ai/electrical)
- [Careers](https://www.augmenta.ai/careers)
- [About](https://www.augmenta.ai/about)
- [Press](https://www.augmenta.ai/press)
- [Contact us](https://www.augmenta.ai/contact)
- [Privacy](https://www.augmenta.ai/legal/privacy-policy)

Augmenta ©2024. All rights reserved.